Case Study: King Fahd Industrial Port
Project
King Fahd Industrial Port
Client
Ports Authority – Ministry of Transportation
Location
Jubail Industrial City, Kingdom of Saudi Arabia
Task
-
Fosam, Fosroc's joint venture in Saudia Arabia was commissioned to inspect the condition of the concrete and steel berth structures, originally constructed in 1983
-
Since the port's construction, deterioration set in as a result of galvanic corrosion
of steel reinforcement, accelerated by the salty environment, and causing significant revenue losses
and decreasing asset value
-
The port was due to be sold to a private buyer and the requirement was to sell with
a guaranteed future operating design life
-
Specifically, Fosroc was required to identify the problems and specific causes,
determine the degree of deterioration and design a comprehensive solution to repair
and ensure performance and durability
Constructive Solution
Value to Client
-
Fosroc was able to provide a unique, high technology solution to deliver
the additional durability, enabling active protection for in excess of 25 years
-
There was no lost berthing time during implementation
-
The solution also reduced ongoing maintenance and running costs